Prototype ≠ Production
A good sample means little if materials, dimensions or assembly change during mass production.
For retail design & rollout teams
Already have fixture designs, drawings or a defined rollout scope?
We coordinate the China-side work — from production RFQs and prototypes to quality control, store-by-store kitting and numbered packing.
Best suited to permanent, non-electrical retail fixtures with a defined store count or production scope.
Fixture imagery is illustrative and does not show a completed R01 project.
01 / The rollout risk
What usually creates risk is everything between an approved design and a store-ready shipment.
A good sample means little if materials, dimensions or assembly change during mass production.
A production or quality issue discovered after arrival is already much harder to fix.
Hardware, graphics, components and cartons need to reach the right store in the right configuration.
Metal, board, acrylic and graphics may come from different processes — but the finished fixture still has to fit together correctly.
02 / Scope of coordination
Translate an approved scope into comparable factory quotations and a practical manufacturing route.
Coordinate the first physical build, identify production issues and track approved revisions.
Keep drawings, BOM changes and production instructions aligned before and during mass production.
Check agreed dimensions, finish, assembly, quantities and packing before shipment.
Match fixtures, hardware, graphics and instructions to the correct store allocation.
Create traceable carton IDs, packing lists and a controlled handover to the agreed logistics route.
Illustrative rollout example
Kit contents
Carton plan
Illustrative project structure for explanation only. Not a completed client project.
Send the project scope and get a preliminary China production view.
03 / The process
Share the available drawings, BOM, store count, quantities and target timing.
We review what can be produced together, what may require specialist processes, and return an initial China-side production view.
Build and review the prototype before mass production. Changes are recorded before approval.
Follow the agreed production route, verify key milestones and close identified issues before shipment.
Allocate components by store, control hardware and carton IDs, then coordinate consolidation and shipment handover.
04 / Project fit
Example execution documents
Project decisions, revisions, inspections and store allocations should be traceable — not buried in chat history.
Closed
These example documents show the intended control method. They are not records from a completed client project.
05 / FAQs
No. We coordinate China-side production execution around the requirements of the project. Where practical, we prefer one capable main factory with specialist support only where it adds real value.
Not necessarily. A defined fixture concept, approximate dimensions, quantities and store count can be enough for an early discussion. A reliable production quotation will require more detailed technical information.
No. More suppliers do not automatically mean a better result. If one suitable factory can manufacture and control the project effectively, there is no reason to create unnecessary complexity.
We can coordinate the China-side handover and logistics requirements based on the agreed project scope. The final shipping route, Incoterm and import responsibilities are confirmed project by project.
06 / Start a review
Send the basic project scope and we’ll review whether China production is practical and what information is still needed for a preliminary budget.
Fixture type, approximate quantity, number of stores, and target timing. Drawings can follow by email.